BoB GPON Smart Tester
Summary of Equipment
At present, the amount of ONU, such as GPON, EPON,10G EPON, XGPON1, XGSPON, is increasing. But with the pressure of cost, many companies are switching BoB solutions, namely BOSA on Board solution, which is used to replace the common optical module solutions. Obviously, BoB has a large market and can reduce costs. The most direct advantage is that it doesn’t need to use structural parts, PCB boards, etc. At the same time, the profit of the module is reduced. But the common problems are how to design BoB, how to debug, how to adjust and the through rate of production and so on. The BoB photonics performance means that companies need adjust &test modules by themselves which becomes more complicated than to use a module directly. For better and more efficient completion of the commissioning, testing, and subsequent mass production issues, ZKTel will support you everything, including design, commissioning, curve fitting, mass production etc. to help your company to get a significantly competitive station in the market. At the same time, our system can be suitable different main chips, such as Broadcom, Marvell, Cortina, Realtek, MTK, ZTE, Hisilicon, etc., as well as different laser chips, such as Semtech NT25L95, NT25L98, Mindspeed MO2099, UXFAST UX3328S, MTK MTK7570 and so on.
This equipment system is equipped with 1 test station. Each test station can put 8 ONUs, which is convenient for users to debug and test the optical performance of BoB ONU products. At the same time, it can greatly improve efficiency, reduce waiting time and save cost.
Function
This system can significantly increase the efficiency of equipment usage, debug and test the parameters of the optical performance of GPON or EPON BoB optical products at eight stations simultaneously. At the time that the one ONU are being commissioned, each of the other seven ONU at each station will start up and test transmit optical power, transmit turn-off, receiver index, digital diagnosis function, optical cat chip configuration information, etc.Paralleled. After the ONU’s commissioning of the current station is completed, it will start the next step . This will reduce the time to start-up and warm-up.
The operation is very simple that the operator only needs to insert and withdraw and scan, all debugging is finished automatically.
Online Consultation
A good business needs more communication, we are totally ready to offer you our help with our professional product knowledge and experience.
Related products
TOP
Address: No.6, Shuangyan Rd., Doumen Street, Yuecheng District. Shaoxing City, ZhejiangProv. China 312071
E-mail: sales@zktel.com
Service hotline:
Copyright (C) Shaoxing ZKTel Equipment Co.,LTD.
Copyright (C) Shaoxing ZKTel Equipment Co.,LTD. All Rights Reserved.